June 14, 2023

Upcoming Electrical Work by City Will Shut Off Power to Parking Garages

From Friday, June 30, through Sunday, July 2, the electrical panel that serves Children’s staff parking lots 1, 2, 3 and 4b will be updated. Seattle City Light will be disconnecting the meter and power will be shut off in Lots 1 through 4 during this time. The garage lights will be out and the garages will be darker than normal. To help mitigate the dark conditions and allow staff to travel safely to and from their vehicles, generators will power temporary lighting at each parking level when it is dark outside. The lighting will be positioned down so as to not shine light toward neighbors. Seattle City Light will have two trucks working near the electrical meter at Sand Point Way NE and NE 50th Street. This work is being completed this time of year to take advantage of maximum daylight. For questions, please contact construction@seattlechildrens.org.